
Walk-In Coolers & Freezers
Boxes that won’t hold temperature, iced coils, failed compressors and door problems, plus new builds.
- Repair, installation and replacement
- Custom walk-in builds sized to your load
- Door gaskets, hinges and strip curtains

Repairs, replacements, new installations and scheduled maintenance. Equipment holding product gets priority. Hover a card for the details.

Boxes that won’t hold temperature, iced coils, failed compressors and door problems, plus new builds.

One-, two- and three-door reach-ins, glass-door units and freezers.

Pans holding warm on the line is a food safety problem. We fix the airflow, refrigerant and control faults behind it.

Low production, dirty ice, water leaks and machines that won’t cycle.

Find the leak and fix it properly instead of topping off every month, and keep defrost cycles doing their job.

Scheduled visits for the whole line so small faults never become lost product or a failed inspection.
Emergency service is available. Call 727-433-9312 and tell us what the box is holding and the current temperature so we can prioritize. In the meantime keep the door closed and move product only if the temperature climbs above safe holding ranges.
Yes. New builds, expansions and replacements, including panels, doors, refrigeration systems and controls, sized to the space and the load you need to hold.
At least every six months, and more often in high-volume kitchens. Scale and slime build-up cut production, affect taste and are a common health inspection finding. We clean, descale and sanitize on a schedule.
The usual causes are a leaking door gasket, an iced-over evaporator from a failed defrost cycle, low refrigerant from a leak, or a dirty condenser coil. Each has a different fix, so we diagnose rather than guess.
Yes. Scheduled visits cover condenser and evaporator coils, door gaskets and hinges, defrost cycles, drain lines, refrigerant levels and ice machine cleaning, so small problems get caught before they cost you product.
Call and tell us what the equipment is holding and the temperature it is reading. Equipment holding product gets priority.